用户名: 密码:
新用户注册
监管者: Hrqls , coan.net , rod03801 
 BrainKing.com

Board for everybody who is interested in BrainKing itself, its structure, features and future.

If you experience connection or speed problems with BrainKing, please visit Host Tracker and check "BrainKing.com" accessibility from various sites around the world. It may answer whether an issue is caused by BrainKing itself or your local network (or ISP provider).

World Of Chess And Variants (videos from BrainKing): YouTube
Chess blog: LookIntoChess.com


讨论板列表
状态: 所有人能发表
帖子搜索:  

16. 十月 2004, 02:24:22
plaintiger 
plaintiger修改(16. 十月 2004, 02:24:58)
i'd like to request that, since the "overwrite" option seen during setup in Espionage is potentially destructive (and will be used less often than "load position" option), it be placed lower in the list. the more potentially destructive an option is, the later it should appear in any list, to reduce the possibility of its being chosen by accident. so with this thought in mind, it's my belief that the list should read:

- load position
- rename position to __________
- overwrite selected position [or whatever it says]
- delete position

does that make sense?

(i think it does, obviously... ;)

日期和时间
在线的朋友
最喜欢的讨论板
朋友群
每日提示
Copyright © 2002 - 2025 Filip Rachunek, 版权所有
回顶端