Nom d'utilisateur: Mot de passe:
Enregistrement d'un nouveau membre
Modérateur: Hrqls , coan.net , rod03801 
 BrainKing.com

Board for everybody who is interested in BrainKing itself, its structure, features and future.

If you experience connection or speed problems with BrainKing, please visit Host Tracker and check "BrainKing.com" accessibility from various sites around the world. It may answer whether an issue is caused by BrainKing itself or your local network (or ISP provider).

World Of Chess And Variants (videos from BrainKing): YouTube
Chess blog: LookIntoChess.com


Liste des forums de discussions
Mode: Tout le monde peut poster
Recherche dans les messages:  

16. Octobre 2004, 02:24:22
plaintiger 
modifié par plaintiger (16. Octobre 2004, 02:24:58)
i'd like to request that, since the "overwrite" option seen during setup in Espionage is potentially destructive (and will be used less often than "load position" option), it be placed lower in the list. the more potentially destructive an option is, the later it should appear in any list, to reduce the possibility of its being chosen by accident. so with this thought in mind, it's my belief that the list should read:

- load position
- rename position to __________
- overwrite selected position [or whatever it says]
- delete position

does that make sense?

(i think it does, obviously... ;)

Date et heure
Amis en ligne
Forums favoris
Associations
Astuce du jour
Copyright © 2002 - 2025 Filip Rachunek, tous droits réservés
Retour en haut