Utilizador: Password:
Registo de novo utilizador
Moderador: Hrqls , coan.net , rod03801 
 BrainKing.com

Board for everybody who is interested in BrainKing itself, its structure, features and future.

If you experience connection or speed problems with BrainKing, please visit Host Tracker and check "BrainKing.com" accessibility from various sites around the world. It may answer whether an issue is caused by BrainKing itself or your local network (or ISP provider).

World Of Chess And Variants (videos from BrainKing): YouTube
Chess blog: LookIntoChess.com


Mensagens por página:
Lista de Fóruns
Não pode escrever mensagens neste fórum. O nível mínimo de inscrição para o fazer neste fórum é Nível Cavaleiro.
Modo de acesso: Qualquer um pode escrever
Procurar nas mensagens:  

4. Maio 2007, 16:14:38
TarantinoFan 
Can someone please tell me why a tournament with a 9 day time control is showing 12 days 15 hours for the next move? Did I do something wrong in the set up?

It's the Pits!!! First Ever Slow Tournament

4. Maio 2007, 16:38:21
coan.net 
Assunto: Re:
TarantinoFan: That also includes "weekend days" - which each person gets 2 a week.

5. Maio 2007, 02:46:41
TarantinoFan 
Assunto: Re:
BIG BAD WOLF: So it is counting 9 weekdays and 2 weekends then? That kinda makes sense then. I was only expecting it to give 11 days though. Wasn't thinking that we were right at the start of a weekend now.

5. Maio 2007, 03:21:46
coan.net 
Assunto: Re:
TarantinoFan: Depends on when a person has their weekend days set. So if the 2 weekend days are early in the 9 days, then 2 weekend days + 5 regular days + 2 more weekend days + 4 more regular days = 13 days (which may be why you see 12 1/2 hours left on time)

Data e hora
Amigos online
Fóruns favoritos
Clubes
Dica do dia
Copyright © 2002 - 2024 Filip Rachunek, todos os direitos reservados.
Voltar para o topo